
Two weeks ago they really drilled us. Last week we got looped. The folks from G.O. Loop came with the sunshine and dug trenches. They connected the tubing from the four 150' holes and stubbed into the basement. They will come back when it is time to activate the system and connect to the heat pump, fill the tubing with ethanol, and we will be heating and cooling "geo-thermal style". Cool stuff
Arun and Reese built the bearing walls needed in the basement that will allow us to begin building walls on the main floor. If it would only snow a little.
No comments:
Post a Comment